Projects

Over the years WABS Pacific - Consultants , Welders and Blasters have been engaged with a number of projects through out the Pacific, here are few projects 

Tank Construction (Samoa)

Providing consultant and Welders for Blasting and Welding Engineers a Sub-contractor for Lucky Construction for the construction of brand new Oil Tank for Pacific Petroleum services Samoa from 2016-2017

Structural Building (Fiji)

Supporting local engineers  Blasting and Welding Engineers by  providing techinical and consultancy support for the construction of a platform under SOPAC for surveying equipment at Suva Queens wharf  (2013) 

Civil Works (Nauru)

Providing technical and consultancy support to Pacific Equitor and B&W Engineers in Nauru for the construction and maintenance of government water tanks . (2012)

Ship Repair and Maintentance (Fiji)  

Providing support crew consisting of  welders and fabricators plus consultancy  experties to B&W Engineers for the upgrading of 2 bauxite barges for Aurum Exploration to meet Fiji Maritime laws and regulations .(2012-2013)

Demolition Works (Nauru)

Demolition of Nauru Utilities desalination Water plant, providing consultants as well as senior welders for B&W Engineers for government project. (2013) 

Industrial Painting 

Providing painting experts with 20 year experiance  for both industrial and domestic works . 

Working with clients such as Total Fiji Ltd , PPS Samoa and Aurum Exploration as sub-contractor to B&W Engineers. 

Tank Cleaning (Fiji/ Samoa)

Cleaning toxic materials from oil industries such as sludge removal and  Tank cleaning both inside and outside with safety standards compliance to international oil safety standards. 

Fabrication (Fiji) 

Fabrication of 1 of 2 propellers for Aurum Exploration barge damaged during a storm in 2012 

Water Tank Construction

(American Samoa) 

WABS Pacific was hired as a sub-contractor to look after the building of 2 new water storage tanks for the government of American Samoa under PPG as the Primary Contractor, with a team of 6 senior welders and consultant in early 2018. 